Chapter 3
Vista de pagina 0
1 2 3 4 5 6 ... 39 40

Indice de contenidos

Pagina 1

Chapter 3

Pagina 4

3-1.5 METERS REQUIRED FOR BTS A/T INCLUDING INFRASTRUCTURE:- 1. SMPS:-

Pagina 5

3-1.6 GSM NETWORK FREQUENCY Sl. No ARFCN TRANS FREQUENCY IN MHz RECEIVE FREQUENCY IN MHz 1 63 947.6

Pagina 6

3-1.7 GSM BTS A/T (Lucent) General:-

Pagina 7

BTS A/T started:- Note that the following tests are deleted from the Test schedule. 1. Trans frequency , 2. Check of feeder cable loss, 3. Check

Pagina 8

Before starting BTS A/T lock BTS site i.e. all the 3 sectors from OMC-R .Put off the Rack. Again restart and check that all Hardware getting restored

Pagina 9

92 VSWR Test:- See Fig. 3-1 for RF cable W/G. There are two types of VSWR meters. 1. Site Master Anritsu or Bird (with power measurement) 2. Bird

Pagina 10

93 3-1.8 ALCATEL BTS Please see BTS front view , TRE, and Combiner in Fig. 3-6, 3-7. Alcatel project was launched in DEC 2004. There were three t

Pagina 11

94 Before starting Transmission A/T of BTS, lock BTS site from OMC-R, and confirm. Carry out initialization of BTS as

Pagina 13

95 There are some tests which are to be seen in RI (Remote Inventory). Simulate the condition and check in RI as follows, 1. Checking of Antenna m

Pagina 14

4. If any unit is extracted then display shows as Hardware degraded, if put in then there will be no alarm on display. 5. If VSWR out then LED on T

Pagina 15

2. Site Master: - Make: Anritsu and Bird. Anritsu: - Models - S 113 B (5-1200 MHz), See Fig. 3-8

Pagina 17

3-1.10 GSM frequency band and Site Mast Agilent Site Master:- Systems Uplink MS-BTS Downlink BTS-MS R GSM-900 876-890 MHz 921-935 M

Pagina 19

3-2 - : GSM COVERAGE A/T :- 3-2.1 General - A coverage with content and quality has got to be quite rarity,

Pagina 20

3-2.5 Proceed for coverage :- 1. First of all take a local JTO/SDE who knows all important places, gullies of the city where cov

Pagina 22

3-2.6 Sample of: - 1. Link budget consideration:- The objective of the link budget is to determine the limiting factors on the RF signal and

Pagina 23

3-1.1 Some important abbreviations frequently in use of GSM network:- Sr.no. Abbreviations Long forms 1 G

Pagina 25

3.3 TOWER A/T Tie Beam Soil Rest Platform Concreting 6’-8’ Anchor Plate Ring Earth 3-3.1 1] SACFA clearance: - What is

Pagina 27

3-3.3 5] Painting of tower as per standard: - The main purpose of tower painting is day time warning to Aircraft and to avoid rusting of tower mater

Pagina 28

Rectangular W/G :- 4 GHz - WR 229 6 GHz - WR 137, WR 159,

Pagina 29

3-3.5 17] Concreting of tower base plates:-To avoid rusting of base plate, theft of nut and bolts and to keep tower structure undisturbed, concreti

Pagina 30

3-3.7 New procedure for Tower A/T :- As per the new circular dated 02/07/2007, Tower A/T should be completed as per new test schedule w.e.f. 01/08

Pagina 31 - Tie Beam

3-4 A/T of 15 GHz/ 8 MB, Digital M/W system as a BTS media 3-4.1General:-

Pagina 32

3-4.5 Acceptance Testing:- - Carry out test at Location A ands B on laptop, expected Rx level and compare it with survey report. The li